The construction and erection of distribution networks up to 34.5 kV, with supply of design and materials.

Major works:

CESP – Cia Energética de São Paulo

  • 3.400 km of rural lines installed
  • 6.650 distribution transformers
  • 32.000 concrete poles
  • 8.500 consumers

CELESC – Centrais Elétricas de Santa Catarina S/A

  • 12.500 km of rural lines installed
  • 13.000 distribution transformers
  • 84.000 concrete poles
  • 68.000 consumers

CERON – Centrais Elétricas de Rondônia S/A

  • 4.400 km of rural lines installed
  • 9.033 distribution transformers installed
  • 40.859 concrete posts installed
  • 10,600 consumers